Australian houses and the trades that keep them standing

Weatherboard JournalWEATHERBOARD JOURNAL

Licensing Qld

Queensland trade licensing and the $3,300 rule

In brief

The Queensland Building and Construction Commission licenses builders and most building trades, and the Electrical Safety Office licenses electricians. A QBCC licence, a written contract and home warranty insurance are all required once building work is valued over $3,300. Plumbing, drainage and gas fitting need a licence at any value.

Queensland at a glance, checked November 2026
Building regulatorQueensland Building and Construction Commission (QBCC)
Licence checkQBCC licensee register
Licence needed for building workBuilding work valued over $3,300. Any value for plumbing, drainage, gas fitting, chemical termite management and fire protection.
Written contractOver $3,300 a Level 1 contract; at $20,000 or more a Level 2 contract with the Consumer Building Guide.
Home warranty coverQueensland Home Warranty Scheme on residential work over $3,300 including GST.
Deposit limit20 per cent up to $3,300; 10 per cent from $3,301 to $19,999; 5 per cent at $20,000 or more.
Cooling-offFive business days on contracts over $3,300.
ElectriciansElectrical Safety Office.
Plumbers and gasfittersQBCC, at any job value.
ComplaintsQBCC, which can issue a Direction to Rectify.

The number to remember

Most states have a ladder of thresholds. Queensland has one rung that does three jobs. At a job value of $3,300, including labour, materials and GST:

  • the contractor must hold a QBCC licence;
  • the agreement must be a written contract; and
  • residential work must be insured under the Queensland Home Warranty Scheme.

It is the lowest set of thresholds we found in any state, and it means a modest bathroom refresh or a new deck is regulated work.

Who must hold a QBCC licence

The Commission lists the triggers. A licence is needed for building work valued over $3,300, for hydraulic services design valued over $1,100, and at any value for:

  • plumbing or drainage
  • gas fitting
  • chemical termite management
  • fire protection
  • completed residential building inspections
  • building design and site classification
  • mechanical services.

Search the QBCC licensee register before you sign. The Commission also advises asking to see the licence itself, and notes that a digital QBCC licence shown on a phone has the same legal standing as the physical card.

Electricians are outside the QBCC. They are licensed by the Electrical Safety Office, which runs its own electrical licence search and tells householders to look for the electrical contractor licence number and confirm it is current before agreeing to any work.

Contract levels

Value of workContractMaximum deposit
Less than $3,300Not required20%
$3,301 to $19,999Level 1 written contract10%
$20,000 or moreLevel 2 written contract, with the QBCC Consumer Building Guide5%

A Level 2 contract must state the price, and a warning about anything that could change it, on the first page of the contract schedule. The contractor must give you a fully signed copy within five business days of the contract being entered into.

One exception lifts the deposit cap. Where substantial customised work or prefabrication is done away from the site and represents more than 50 per cent of the contract price, a deposit of up to 20 per cent is allowed. Kitchens and made-to-measure joinery are the usual cases.

Progress payments

The number and timing of progress payments is negotiated, but every payment must be relative to the work completed. The QBCC's example: a contractor cannot claim more than 50 per cent of the price, deposit included, until at least 50 per cent of the work on site is done.

The Commission adds a warning with money attached. If you pay more than the lawful deposit, you will not be able to recover the excess in a home warranty claim for refund of deposit.

Cooling-off

Contracts over $3,300 must tell you about your right to a cooling-off period of five business days, under section 35 of Schedule 1B of the QBCC Act. The clock starts the day after you receive a signed copy of the whole contract, plans and specifications included, and for contracts of $20,000 or more a copy of the Consumer Building Guide. If the contractor is slow to hand those over, the period runs longer.

Withdrawing is not free. Section 38 lets the contractor keep, in most cases, $100 plus out-of-pocket expenses reasonably incurred before you withdrew, and the notice must be written and signed.

The Queensland Home Warranty Scheme

Residential work over $3,300 must carry cover under the scheme, and the contractor pays the premium. A policy covers a maximum of $200,000 for each category of loss, or $300,000 if optional additional cover was bought within the time limits.

The time limits are tight and worth diarising. Work is covered for 6 years 6 months. A claim for a structural defect must be made within 3 months of first becoming aware of it. For a non-structural defect, you must become aware within 6 months of the work being substantially complete and claim within 7 months of that date.

The QBCC also notes that accepting a quote below fair market value can reduce the compensation paid on a later claim.

Complaints

Defective or incomplete work is reported to the QBCC, which can issue the responsible licensee a Direction to Rectify. The Commission offers mediation and conciliation for contract disputes as well.

Questions about Queensland licensing

Does a painter or carpenter need a QBCC licence?

Yes, once the building work is valued over $3,300. The any-value list is narrower and covers plumbing, drainage, gas fitting, chemical termite management, fire protection and a few professional services.

What does it cost to pull out during cooling-off in Queensland?

Usually $100 plus the contractor's reasonable out-of-pocket expenses up to the point you withdrew, as set by section 38 of Schedule 1B of the QBCC Act.

Sources

  1. Who must hold a QBCC licence, QBCC
  2. Contracts and agreement types, QBCC
  3. Deposits and progress payments, QBCC
  4. Cooling-off period, QBCC
  5. Queensland Home Warranty Scheme, QBCC
  6. Maximum amounts covered, QBCC
  7. Time limits for cover and claims, QBCC
  8. Seeking and comparing quotes, QBCC
  9. Defective work dispute, QBCC
  10. Electrical licence search, Electrical Safety Office

How this page was put together. Every figure above was read from the 10 source pages listed, published by the Queensland Building and Construction Commission and the Electrical Safety Office, and opened in November 2026. Where two official pages disagreed we used the regulator's own and said so. The regulator's page is the authority; tell us at corrections@weatherboardjournal.com if one has changed.