How-to

Practical pieces for dealing with tradies

Short, specific guides to the paperwork side of a building job: quotes, contracts, deposits, payments and what to do when it goes wrong.

  1. Quotes

    How to read a builder's quote

    A usable quote names the licence holder, describes the work in enough detail that a second builder could price the same job, and separates fixed prices from allowances. Compare at least three written quotes against one written brief, and treat the cheapest with care. In Queensland, accepting a price below fair market value can reduce a later warranty claim.

  2. Payments

    How staged payments should work

    Staged or progress payments are instalments paid as defined parts of the job are finished. The rule in every state is the same in spirit: pay for work done, not for time passed or work to come. Victoria and the Northern Territory publish set percentages for each stage of a new house, and Queensland and Tasmania bar a builder from claiming more than half the price before half the work is complete.

  3. Licences

    How to check a tradie's licence

    Every state and territory runs a free public register where you can search a builder or tradesperson by name or licence number. Check that the licence is current, that it covers the type of work you are buying, and that the name matches the business you will be paying. Do it before you sign or pay a deposit.

  4. Defects

    What a defects period is, and what it is not

    A defects period, often called a defects liability or maintenance period, is a term in your contract during which the builder returns to fix faults that appear after handover. It is separate from the statutory warranties, which the law imposes regardless of the contract and which last far longer: six years for major or structural defects in NSW, the ACT and Tasmania, and five years in South Australia.

  5. Inspections

    How to get an independent building inspection

    The building surveyor or certifier inspects for compliance with the regulations, not for the quality you are paying for. An independent inspector, engaged and paid by you, checks the work against your contract at each stage and at handover. NSW puts the cost at $250 to $500 an inspection, and in Queensland the inspector must hold a QBCC licence.

  6. Deposits

    How much deposit a builder can ask for

    The legal maximum deposit on a home building job depends on the state and the contract price. It is 10 per cent in NSW, 6.5 per cent in WA, and 5 per cent on larger contracts in Victoria, Queensland, South Australia, Tasmania and the Northern Territory. The ACT has no legal cap. In several states the builder cannot take any deposit until you hold the warranty insurance certificate.

  7. Contracts

    How to use a cooling-off period on a building contract

    Most states give you five business days to withdraw from a home building contract after signing, though the trigger and the contract value differ. Withdrawal must be in writing, and in Queensland and Tasmania the builder may keep $100 plus reasonable out-of-pocket expenses. The ACT has no cooling-off period at all.

  8. Contracts

    How to handle variations to a building contract

    A variation is a change to what the contract says will be built. It should be written down, priced, and signed by you and the builder before the changed work starts. NSW, Victoria and Tasmania all require this, and the written variation should show the effect on both the price and the completion date.

  9. Disputes

    How to make a complaint about building work

    Raise the problem with the builder in writing first, because most regulators require you to have tried. If that fails, each state has a regulator that can inspect, conciliate or order rectification, backed by a tribunal or court. Time limits apply and some are short: 90 days for incomplete work in the Northern Territory, and three months for some Queensland warranty claims.

  10. Insurance

    How to check a home warranty insurance certificate

    The builder arranges home warranty cover and must give you a certificate, in most states before taking any money. Check that it names you, your address, the builder and the right contract price, then verify it with the insurer or the scheme's online checker. South Australia's regulator has reported forged certificates, so do not rely on the document alone.

  11. Quotes

    How to write a job brief before you ask for quotes

    A job brief is a written description of the work you want, given in identical form to every contractor who quotes. NSW advises writing one however small the project, and giving the same information to at least three contractors. A good brief names materials and fittings by brand and model, states what is excluded, and says when the work can be done.

  12. Completion

    Handover: what to check before the final payment

    Before you make the final payment, inspect the work against the contract, list any defects in writing, and collect the certificates: a Certificate of Final Inspection or Occupancy Permit in Victoria, an occupation certificate in NSW, and compliance certificates for plumbing, gas and electrical work. The final payment is your last practical hold over the builder, so make it once the paperwork is in your hands.