Terms explained
Building and trade terms explained
The words Australian builders, certifiers and regulators use, in the sense they use them.
In brief
This glossary defines 52 terms used on Australian building sites and in building contracts, from ant cap to weep hole. Definitions follow common trade usage and, where a regulator or the National Construction Code defines a term, that definition. Thresholds and time limits are on the state licensing pages, not here, because they differ by state.
A
- Ant cap
A thin metal plate fitted between the top of a stump or pier and the bearer above it. It does not stop termites. It forces them to build their mud tube around the edge of the plate, where an inspection will find it. See termite management.
- Articulation joint
A deliberate vertical break in a masonry wall that lets sections of the wall move independently as the ground moves, so that cracking happens at the joint and not across the bricks.
B
- BAL
Bushfire Attack Level. A rating of a site's potential exposure to ember attack, radiant heat and flame under AS 3959, running from BAL-LOW through BAL-12.5, BAL-19, BAL-29 and BAL-40 to BAL-FZ, the Flame Zone. See Bushfire Attack Levels.
- Bargeboard
The board fixed along the sloping edge of a gable roof, covering the ends of the roof timbers.
- Base stage
The first payment stage of a new house. In Victoria it is reached when the footings are poured and base brickwork is built to floor level, or the stumps are complete, or the slab is complete, depending on the floor type.
- Bearer
A horizontal structural timber or steel member that sits on the stumps or piers and carries the floor joists.
- Bonded asbestos
Also called non-friable asbestos. Material in which asbestos fibres are bound into cement or resin, such as fibro sheet. It is lower risk while intact and sealed, and becomes hazardous when cut, drilled, sanded or broken. See asbestos in pre-1990 homes.
- Brick veneer
A form of construction in which a timber or steel frame carries the building and a single skin of brickwork stands outside it as cladding, separated by a cavity. See brick veneer cracks.
- Building surveyor
The practitioner who issues building permits and carries out the mandatory inspections for compliance with the building regulations. Called a certifier in New South Wales, Queensland and the ACT.
C
- Certifier
See building surveyor. In the ACT the building certifier must check that residential building insurance is in place before issuing a commencement notice.
- Class 10a
The code's classification for a non-habitable building such as a private garage, carport or shed. Western Australia set a separate builder registration threshold for these in 2026. See WA licensing.
- Class 1a
The National Construction Code's classification for a house, including a detached house and attached dwellings such as terraces and townhouses.
- Compliance certificate
A document issued by a licensed tradesperson stating that their work meets the relevant standards. In Victoria only a licensed plumber, not a registered one, can issue a plumbing compliance certificate.
- Cooling-off period
A short time after signing a contract during which the owner may withdraw. Most states give five business days on home building contracts; the ACT gives none. See using a cooling-off period.
- Cost plus contract
A contract in which the owner pays the actual cost of labour and materials plus a margin, instead of a fixed price. The final cost is not known when the contract is signed.
D
- Damp-proof course
Usually shortened to DPC. A barrier built into the base of a masonry wall to stop ground moisture rising through it. In older houses it may be a layer of tar and sand or slate. See rising damp.
- Defects period
A term in a building contract giving a set time after completion for the owner to report faults and the builder to fix them. It is separate from, and much shorter than, the statutory warranties. See what a defects period is.
- Direction to Rectify
A written direction from the Queensland Building and Construction Commission requiring a licensee to fix defective building work.
- Domestic building insurance
Victoria's former name for home warranty insurance, applying to contracts signed before 1 July 2026. Often shortened to DBI.
E
- Eaves
The part of a roof that overhangs the external walls. The underside lining is the eaves lining or soffit, and on houses built before 1990 it is a common place to find asbestos-cement sheet.
F
- Fibro
Fibrous cement sheet. The original product contained asbestos; sheet made since the phase-out does not, and the two cannot be told apart by eye.
- Fidelity fund certificate
The form residential building cover takes in the Northern Territory, and one of two forms it can take in the ACT.
- Fixing stage
The payment stage at which internal linings, architraves, skirtings, doors, baths, basins, sinks, cabinets and cupboards are fitted and fixed in position.
- Flashing
A strip of impervious material, usually metal, fitted where two building elements meet to direct water away from the joint: around chimneys, over windows, at the base of a wall cavity.
- Frame stage
The payment stage reached when the building's frame is complete. In Victoria it also requires the frame to have been approved by a building surveyor.
- Friable asbestos
Asbestos-containing material that can be crumbled or reduced to powder by hand when dry, such as loose-fill insulation. It releases fibres readily and is the most hazardous form.
G
- Gable
The triangular section of wall at the end of a pitched roof.
H
- Home warranty insurance
Compulsory cover, arranged by the builder for the owner's benefit, that pays if the builder cannot finish or fix the work, usually because of death, disappearance or insolvency. It has a different name in almost every state. See our comparison of the schemes.
J
- Joist
One of the parallel timbers that span between bearers and directly support the floorboards or sheet flooring.
L
- Lock-up stage
The payment stage reached when the external wall cladding and roof covering are fixed, the flooring is laid and the external doors and windows are fixed, even if only temporary ones.
N
- NatHERS
The Nationwide House Energy Rating Scheme, which rates the thermal design of a home out of ten stars. New homes must now meet a 7 star minimum. See insulation and the seven-star rule.
- NCC
The National Construction Code, published by the Australian Building Codes Board. It sets the minimum technical requirements for buildings in Australia. Houses are covered by Volume Two and the Housing Provisions.
O
- Occupancy permit
In Victoria, the document a building surveyor issues to say a new home is suitable to occupy. Extensions and renovations receive a Certificate of Final Inspection instead. New South Wales uses the term occupation certificate.
- Owner-builder
A person who takes legal responsibility for building work on their own land under a permit, instead of engaging a licensed builder to do so. See owner-builder rules.
P
- Party wall
A wall shared by two adjoining buildings, such as the wall between two terrace houses.
- Practical completion
The point at which building work is finished except for minor defects or omissions and can be used for its purpose. The exact meaning depends on the definition in the contract. See handover.
- Prime cost item
An item in a contract, usually a fitting or appliance, that has not yet been selected and is priced at an allowance. If the item finally chosen costs more or less, the contract price is adjusted. Often written PC.
- Progress payment
An instalment of the contract price paid when a defined stage of the work is complete. See staged payments.
- Provisional sum
An allowance in a contract for work whose extent cannot be known when the contract is signed, such as excavating rock. The price is adjusted when the actual cost is known.
R
- R-value
A measure of a material's resistance to heat flow. The higher the R-value, the better the insulation. A Total R-value describes a whole wall, roof or floor assembly.
- Restumping
Replacing the stumps that support a timber-floored house. Called reblocking in Victoria. See restumping.
S
- Safety switch
A residual current device, fitted in the switchboard, that cuts the power when it detects current leaking to earth. It protects only the circuits it is fitted to. See smoke alarms and safety switches.
- Sarking
A flexible membrane laid under roofing or behind wall cladding to shed water and, in some products, to reflect heat.
- Shelter tube
The mud tunnel that subterranean termites build to cross exposed surfaces while staying out of light and dry air. Finding one is the usual first evidence of termites.
- Statutory warranty
A promise about the quality of building work that the law writes into every residential building contract, whether or not the contract mentions it. The periods differ by state.
- Stump
A short post of timber, concrete or steel that supports the bearers of a raised floor. Called a pier when built of masonry.
- Subfloor
The space between the ground and the underside of a raised timber floor. The building code requires it to be ventilated.
T
- Tie-down
The chain of connectors that anchors a roof through the walls to the footings so that wind cannot lift it. See cyclone ratings.
V
- Variation
A change to the work described in a building contract, agreed after signing. It should be in writing, priced and signed before the changed work starts. See variations.
W
- Weep hole
A small opening left in the bottom course of a brick veneer wall, and above openings, so that water in the cavity can drain out.
- Wet area
A room or part of a room that is exposed to water: bathrooms, showers, laundries and toilets. The building code sets out which surfaces must be waterproof and which water resistant. See wet-area waterproofing.
- Wind classification
A rating, such as N2 or C2, that describes the design wind load for a house site. N classes are non-cyclonic and C classes cyclonic.
Missing a term, or think one is wrong? Write to corrections@weatherboardjournal.com.