Australian houses and the trades that keep them standing

Weatherboard JournalWEATHERBOARD JOURNAL

Weatherboard Journal: Australian home and trades magazine

November 2026 issue

Structure

Restumping: what goes on under an old house

Doors that bind, a hump in the hallway, a marble that rolls to the same corner every time. The trouble is rarely the floor. It is the ground, the water in it and the row of stumps in between.

Features

Wind

Cyclone ratings: how a house is held down

Every new house in Australia is given a wind classification before a nail goes in. Get the letter and the number wrong and the engineering that follows is precise, certified and inadequate.

Energy

Insulation and the seven-star rule

New Australian homes must now rate seven stars, not six. The batts that get them there only perform if they are installed with a care the trade has not always shown.

Doing it yourself

Owner-builder rules, state by state

An owner-builder permit lets you run your own job. It also makes you the builder in the eyes of the law, with the warranties, the insurance questions and the resale strings that come with the title.

House types

The Queenslander: an owner's manual

Timber, tin and a great deal of air. The high-set house of the north is a machine for staying cool, and nearly everything that goes wrong with one starts where somebody stopped it breathing.

House types

Brick veneer: reading the cracks

The bricks on most Australian houses hold up nothing but themselves. Knowing that changes how you read a crack, and how much you should pay someone to worry about it.

Licensing, state by state

Who regulates the trades where you live, where to check a licence, and the dollar figures that trigger a written contract or warranty cover.

How-to

  1. How to read a builder's quoteQuotes
  2. How staged payments should workPayments
  3. How to check a tradie's licenceLicences
  4. What a defects period is, and what it is notDefects
  5. How to get an independent building inspectionInspections
  6. How much deposit a builder can ask forDeposits
  7. How to use a cooling-off period on a building contractContracts
  8. How to handle variations to a building contractContracts
  9. How to make a complaint about building workDisputes
  10. How to check a home warranty insurance certificateInsurance
  11. How to write a job brief before you ask for quotesQuotes
  12. Handover: what to check before the final paymentCompletion

Terms explained

Ant cap

A thin metal plate fitted between the top of a stump or pier and the bearer above it. It does not stop termites. It forces them to build their mud tube around the edge of the plate, where an inspection will find it. See termite management.

Bearer

A horizontal structural timber or steel member that sits on the stumps or piers and carries the floor joists.

Fibro

Fibrous cement sheet. The original product contained asbestos; sheet made since the phase-out does not, and the two cannot be told apart by eye.

Practical completion

The point at which building work is finished except for minor defects or omissions and can be used for its purpose. The exact meaning depends on the definition in the contract. See handover.

Prime cost item

An item in a contract, usually a fitting or appliance, that has not yet been selected and is priced at an allowance. If the item finally chosen costs more or less, the contract price is adjusted. Often written PC.

Sarking

A flexible membrane laid under roofing or behind wall cladding to shed water and, in some products, to reflect heat.