Australian houses and the trades that keep them standing

Weatherboard JournalWEATHERBOARD JOURNAL

Maintenance

Repainting weatherboards without poisoning the garden

A weatherboard house wants a new coat about as often as a dog wants a walk. On anything built before 1970 the old coats underneath are the part to plan around.

A brush laying fresh paint along a run of weatherboards
Preparation is most of the job, and on an old house it is also most of the risk. Drawing: Weatherboard Journal.

The boards on the weather side of an old house keep a diary. Look closely at a flaking patch under a north-facing window and you can count the coats: a chalky white on top, something cream below it, a green nobody would choose now, and at the bottom a hard, slightly pink primer on bare timber. Each layer was somebody's fresh start. Several of them are the reason this job needs more thought than a trip to the paint counter.

The lead question comes first

The Australian Government's booklet on the subject, Lead alert: the six step guide to painting your home, is specific about dates. Paints containing as much as 50 per cent lead were used inside and outside homes built before 1950. Paint with more than 1 per cent lead was still in use until the late 1960s, and the booklet offers a rule of thumb that lead content was limited to 1 per cent by 1970. A limit of 0.25 per cent was recommended in 1992, and it has been 0.1 per cent since December 1997.

The same booklet warns against treating 1970 as a clean line. Homes built later can still carry paint above 1 per cent where old stock, industrial paint or marine paint was used, and red-lead primer went on timber window sills "well into the 1970s". That pink layer at the bottom of the flake is the one to be suspicious of.

Lead in sound paint under sound topcoats is not doing anything. Lead becomes a hazard when you turn it into dust or fume, which is precisely what conventional preparation does. The booklet says children can absorb up to 60 per cent of the lead they swallow, and they swallow it the way they swallow everything else, off their hands. Paint dust from a sanded wall ends up in the soil of the garden bed below it, in the sandpit, on the dog and in the vegetable patch.

Find out before you sand

The guide's first step is to establish how much lead you have. There are three routes. Colour-change test kits are sold at hardware and paint shops for $25 to $100; the booklet carries a printed warning that they can give both false negatives and false positives, and that the colour change is hard to read on dark paint. A contractor with portable XRF equipment can screen a wall without damaging it. An analytical laboratory will give you a number from a posted sample, again for $25 to $100 a sample by the booklet's figures, though it will not interpret the result for you.

On a pre-1970 house the cheapest sensible approach is to assume lead is present and prepare accordingly. The extra precautions cost less than the testing regime needed to prove you can skip them.

Preparation that keeps the dust down

The booklet's instructions amount to a different way of working, and a painter who quotes for an old house should be able to describe it without prompting.

  • No dry sanding and no dry blasting. The guide says outright not to remove paint by dry abrasive blast cleaning or dry mechanical sanding. Wet scraping and wet hand sanding are the baseline. Power sanding is contemplated only with a HEPA vacuum attachment.
  • Catch what comes off. The guide's third step is about setting up so that as little residue as possible is produced and as much as possible is caught on plastic sheeting. It tells you not to work outdoors on a windy or wet day, because dust blows or washes off the sheets.
  • Dress for it. A respirator meeting Australian Standard 1716 with P1 or P2 filters, disposable coveralls, overshoes, a hat and gloves. A half-face respirator will not seal over a beard.
  • Clear the house. Pregnant or breastfeeding women, women planning a pregnancy, young children and pets should be out of the home whenever lead paint is being disturbed.
  • Clean up with the right vacuum. Only a HEPA filter captures fine lead particles. The booklet calls ordinary vacuum cleaners dangerous here, because they blow lead dust out through the exhaust and spread it further.

None of this is exotic. It is slower than attacking the wall with an orbital sander, and the quote should reflect that. A price that looks too good on a 1930s bungalow usually means the preparation has been costed as if the house were built in 1995.

There is also a legitimate alternative to removal. The guide notes that covering paint containing lead may be cheaper in the short term than taking it off. Where the old film is sound and well stuck, washing it down, spot-priming and painting over it leaves the lead where it has sat for seventy years.

While the scaffold is up: boards and fixings

Paint fails early on boards that are wet from behind, split at the nails or lapped too little, so repair comes before colour. Part 7.5 of the National Construction Code's Housing Provisions sets the rules for new timber cladding, and they are a fair checklist for replacement boards too.

Splayed timber weatherboards must lap the board below by a set minimum, and for hardwood, cypress and treated pine that minimum is 30 mm. Narrow profiled boards, those not more than 130 mm wide, take one fixing at each stud; wider boards take two. Where nail heads are punched and filled before painting, the code calls for standard steel flat head nails or self embedding head screws. And if the house is within 200 m of breaking surf, fixings into timber framing must be stainless steel.

The coastal rule explains a familiar sight in beach suburbs: neat vertical rows of rust blooms bleeding through an otherwise sound paint film. Repainting over them buys a summer. Punching, sealing and filling the heads, or replacing the fixings in the worst boards, buys a decade.

A few habits from the trade are worth insisting on. Prime the back, the edges and above all the cut ends of any new board before it goes on the wall, because end grain drinks water. Do not run a bead of sealant along the underside of each lap; that gap is how the wall dries. And look hard at the bottom two boards and the corner stops, which rot first because they catch splash from the ground.

Who can take the job

Painting is licensed work in parts of the country and unlicensed in others, so check before assuming.

In New South Wales a contractor licence is required for any residential trade work, painting included, valued at more than $5,000 in labour and materials including GST, and the same figure triggers a written contract. The penalty for unlicensed work under the Home Building Act is listed at $22,000 for an individual. Most whole-house exteriors will exceed the threshold.

Western Australia draws the line far lower. Under the Building Services (Registration) Act 2011 a painter must be registered to carry out painting work valued over $1,000. Building and Energy says the work should follow AS/NZS 2311:2017 or the paint maker's specification, that a registered painter cannot delegate responsibility for it, and that a customer can lodge a workmanship complaint for up to six years after practical completion.

Wherever you are, the painter is also a person conducting a business, and work health and safety law applies to how they handle lead and, on a fibro house, asbestos. Tell them the age of the house when you ask for the quote. A good one will ask first.

Questions readers ask

Is it safe to burn the paint off with a heat gun?

Heat is one of the ways lead gets into the air. NSW EPA lists lead fumes from tools such as a heat gun as a source of exposure in older homes. On a pre-1970 house, wet scraping and wet sanding are the methods the federal guide is built around.

How do I get rid of the scrapings?

Disposal is the sixth step of the federal guide, which treats scrapings, dust and used sheeting as lead-contaminated waste. Bag it as you go, keep it away from children, and ask your council or state environment regulator where that kind of waste is accepted locally.

Sources

  1. Lead alert: the six step guide to painting your home, Australian Government (fifth edition)
  2. Stay safe from lingering lead, NSW Environment Protection Authority
  3. NCC 2022 Housing Provisions, Part 7.5 Timber and composite wall cladding, Australian Building Codes Board
  4. Painting work, NSW Government
  5. Information and obligations for registered painters and decorators, Government of Western Australia