How to get an independent building inspection

In brief

The building surveyor or certifier inspects for compliance with the regulations, not for the quality you are paying for. An independent inspector, engaged and paid by you, checks the work against your contract at each stage and at handover. NSW puts the cost at $250 to $500 an inspection, and in Queensland the inspector must hold a QBCC licence.

Owners often assume that because a building surveyor or certifier is inspecting the job, somebody is looking after their interests. That is a misreading of the role.

Two inspectors, two jobs

Consumer Affairs Victoria describes the first role in one sentence: the building surveyor inspects work to check it meets the minimum standards of the building regulations. That means the mandatory stages, such as footings, frame and final. It does not mean checking that the tiles are the ones you chose, that the walls are plumb enough to hang a door on, or that the paint has two coats.

The second role is the independent building consultant or inspector you hire yourself. Victoria's regulator says you can use one to check completed work and advise you before you make progress payments, or to supervise the entire project. South Australia's consumer guide says the same, suggesting inspections at key stages, for example when progress payments are due and at handover. New South Wales suggests a progress inspection by an independent building consultant or architect before each payment on a large project.

Both have a place. The surveyor's approval is a legal requirement, and in Victoria the frame stage is not complete for payment purposes until the surveyor approves it. The consultant's report is the evidence you rely on when you query a claim.

When to inspect

For a new house or a large extension, the natural points follow the payment stages: after the base or slab, at frame, at lock-up, at fixing, and at practical completion before the final payment.

The pre-lining inspection deserves particular mention. Once plasterboard is fixed, nobody can see the frame, the insulation, the wet area waterproofing, the bracing or the rough-in of pipes and wires. An inspection at that point finds faults that are cheap to fix that day and very expensive a month later.

For a smaller renovation, two visits are usually enough: one before the walls are closed and one at completion.

What it costs

The NSW Government's figure is between $250 and $500 for each progress inspection. On a build with five stages that is a modest sum against the contract price, and less than the cost of rectifying one concealed defect.

Choosing an inspector

Check their licence as you would the builder's. In Queensland a completed residential building inspection is licensed work at any value, so the inspector must hold a QBCC licence. In Victoria, Consumer Affairs suggests finding a building consultant or inspector through the regulator's practitioner search. Elsewhere, ask what registration and professional indemnity insurance they hold; NSW notes that building consultants are among the professionals who carry it.

Ask three questions before you engage one.

  • Will the report be written, with photographs, and tied to the contract documents and the relevant standards?
  • Do you carry professional indemnity insurance?
  • Have you any commercial relationship with my builder?

Give the inspector the contract, the plans and the specification. An inspector who has not seen what you bought can only tell you whether the work is acceptable in general.

Tell the builder, and write it in

Site access during construction belongs to the builder, so put your right to bring an inspector into the contract before you sign. Agree on notice. Victoria warns that if you or your agent interfere with the work, you are responsible for resulting costs or delays, provided the builder notifies you in writing within 5 business days. An inspection arranged in advance at a stage boundary is not interference. Turning up unannounced and instructing subcontractors is.

Using the report

Send the report to the builder in writing and ask for a response to each item. Keep your tone neutral; most items on most reports are minor and are fixed without argument. Ask your inspector to confirm the rectification before you pay the stage. Do not simply withhold the payment on your own reading of the report: Consumer Affairs Victoria advises taking legal advice before withholding a progress payment over defects.

File every report. If a defect surfaces in year four, a dated photograph of the frame from a named, licensed inspector is the most useful document you will own.

Sources

  1. During construction checklist, Consumer Affairs Victoria
  2. Deposits and payments for building work, Consumer Affairs Victoria
  3. Contracts for residential building work, NSW Government
  4. Insurance requirements for contractors working on your home, NSW Government
  5. Building, extending and renovating a home, Consumer and Business Services (SA)
  6. Who must hold a QBCC licence, QBCC